11000KVA 太陽風力発電のためのプリファブリックサブステーション 50Hz/60Hz
Power Prefabricated Box Type Substation for Solar Wind Compatible 50/60Hz Three-Phase MV&HV Transformers Renewable Energy Product Characteristics Vacuum circuit breaker or load switch + fuse (combined electrical appliance) technical solution can be used on the high voltage side of Huashi box. The electrical characteristics of the combined electrical structure ensure that when any phase fuse is blown, the load switch will trip to cut off power supply, allowing safe fuse
11000KVAの太陽光発電の事前製造サブステーション
,風力発電サブステーション 50Hz/60Hz
,保証付きの再生可能エネルギーサブステーション
| タイプとモデル | S11-5000-33/0.69 | 絶縁レベル | クラスA |
| 定格容量 | 5000kVA | 高圧側 | |
| 定格電圧(HV / LV) | 33kv/0.69kv | 雷インパルス耐電圧(ピーク) | 200kv |
| 定格電流(HV / LV) | 87.5A /4183.7 A | 短時間商用周波耐電圧(rms) | 85kv |
| 電圧比 | ±2 × 2.5 % | 雷インパルス耐電圧(ピーク) | |
| 短絡インピーダンス | 7% | 短時間商用周波耐電圧(rms) | 5kv |
| ベクトルグループ | Dyn11 | ||
| 定格周波数 | 50Hz | ||
| 冷却方式 | ONAN | ||
| 無負荷損失 | ≤ 3970W (+15%) | 外形寸法(L × W × H) | 2650 mm × 2900 mm × 2750 mm |
| 負荷損失 | ≤ 39018W (+15%) | 推定総質量 | 10.7t |
| 音圧レベル | ≤ 77 dB(A) | ||
| 無負荷電流 | 0.50% |
| 特徴 | 利点 | メリット |
|---|---|---|
| 統合設計 | インバーター、変圧器、HV配電を組み合わせる | デバイスが少なく、スペースと設置時間を節約 |
| モジュール構造 | 迅速な納品と容易なO&Mのための標準化されたコンポーネント | O&Mコストの削減、信頼性の向上 |
| 高効率インバーター | >98.5%の変換効率 | 電力損失を最小限に抑え、エネルギー変換効率を向上 |
| スマートモニタリングシステム | リアルタイム監視とリモート制御 | 効率的な管理と障害アラート |
| 包括的な保護 | 過電圧、過電流、短絡保護 | 機器と人員の両方の安全な運用を保証 |
| 全天候型適応性 | IP54定格、過酷な環境で動作 | 砂漠、高原などでの適用が可能 |
- 保護伝送と通信ポイントツーポイントテストを含む100以上のテストによる、完全条件シミュレーションの試運転
- 高強度鋼構造とC5レベルの腐食保護(溶融亜鉛めっき)を備えた軍用グレードの保護エンクロージャ
- 塩水噴霧、風、砂、結露に対する耐性を持つIP54保護等級
- 産業用空調、ファン、電気ヒーター、ガス火災保護システムによるインテリジェントな内部環境制御
-
Three Phase Box Type Substation with 400V-690V Output Voltage and 6kV-220kV Rated Voltage for Power Distribution
All-in-One Inverter & Boost Power Cabin | 100kW–1MW | Solar Energy Integration Consulting Process Step 1: We respond to inquiries within 1 hour, recommending suitable transformers based on your requirements. We provide competitive quotations and flexible payment terms. Our professional drawing and technical teams will confirm all drawing details with you within 7 days after payment, including technical specifications, weight, and parts list. Step 2: After finalizing
-
PV Inverter Boost Cabinet 10-500kW | Integrated Solar Power Conversion and Storage Solution
CONUSULTING PROCESS Step 1: We will respond to your inquiry within 1 hour and recommend suitable transformer according to your needs. At the sametime, we will provide you with reasonable quotations and payment terms.We have a professional and independent drawing team andtechnical team, and we will confirm all the contents on the drawing with you within 7 days after payment. The drawing usuallycontains technical data, weight and parts list. If you have any questions, please
-
油入式プレハブ変電所10KV/0.4KVを備えたコンパクト屋外電源ステーション
Power Station Outdoor Compact Transformer Station / Prefabricated Substation 10KV/0.4KV A complete, compact solution for outdoor power distribution with integrated 10KV/0.4KV transformer in a prefabricated enclosure. Key Features Compact, space-saving design for outdoor installation Integrated 10KV/0.4KV transformer system Prefabricated construction for quick deployment Robust enclosure for all-weather protection Complete power distribution solution in single unit Designed